Wall Tech System
Submit Reports
Daily Diary
Prep Works QA
Post Pour QA
Install QA
Toolbox Meeting
Login
Prep Works QA
Date
Address
Level
Walls Straight?
Double check that all walls are plumb and straight within required tolerance (+/- 4mm over 1800mm)
Please Select
Yes
No
N/A
Blow Out Rectified?
Blow outs/ bulges rectified and smooth
Please Select
Yes
No
N/A
Walls Cleaned?
Walls cleaned and ready for other trades to finish walls (E.g. plasterer, renderer etc.)
Please Select
Yes
No
N/A
De-Braced?
Braces de-braced and taken off walls
Please Select
Yes
No
N/A
Materials Cleared
(Final Floor)?
Ensure all materials are cleared and removed from site e.g. steel, braces, panel off cuts and any other materials used.
Please Select
Yes
No
N/A
Supervisor
Image Upload