Install QA
Date
Address
Level
Construction Drawings
Ensure using "Issued for construction" shop drawings
Please Select
Yes
No
N/A
Horizontal Reo
Check installation of horizontal reo is all compliant with structural, including junctions
Please Select
Yes
No
N/A
Oversized Edge
Oversized edge boards have been supported
Please Select
Yes
No
N/A
Door Secured
All door frames are securely fixed, plum, in wind and braced for concrete (if required)
Please Select
Yes
No
N/A
Lintels Straight
All lintels straight, braced from top and bottom where required
Please Select
Yes
No
N/A
Large Lintels
Props and timbers installed under large lintels
Please Select
Yes
No
N/A
T-Junctions
"T" junctions fully flued, screwed and villa has been broken/cut to allow concrete floor
Please Select
Yes
No
N/A
Wall Striaght
Ensure all walls are plumb, straight, located on surveyor pins
Please Select
Yes
No
N/A
End of Blade
End of blade walls plumb
Please Select
Yes
No
N/A
Wall on Wall
Wall on wall alignment
Please Select
Yes
No
N/A
Correct Fixings
Correct fixings used on braces & secured
Please Select
Yes
No
N/A
Stairwell and Lifts
Check stairwell + lift dimensions including diagonals
Please Select
Yes
No
N/A
Lift Boxes and Struts
Lift call boxes & unit struts installed to set-out provided
Please Select
Yes
No
N/A
Weak Spots
Weak spots supported and holes patched
Please Select
Yes
No
N/A
Strong Backs
Strong backs used where required (dwarf walls)
Please Select
Yes
No
N/A
Panels Cut/Extend
Panels cut/extended as required (shop drawings)
Please Select
Yes
No
N/A
Penetration Cuts
Penetrations cut in by other trades prior to pour
Please Select
Yes
No
N/A
Floor Cleared
Floor & deck cleared and cleaned of offcuts
Please Select
Yes
No
N/A
Nails and Screws
No nails, screws or bolts left on ground around site
Please Select
Yes
No
N/A
Supervisor
Image Upload